Location : Visakhapatnam
Job Category : Govt Jobs, Diploma
Last Date : 07 Jul 2014
Job Type : Full Time
Hiring Process : Written-test
vacancy_details.docx |
Training and Pay : Selected candidates will be on training for a period of twenty four (24) months, which may be extended for cases where progress during training is found not satisfactory. Candidates will be paid a monthly stipend of Rs.10,700/- (consolidated) during the first year and a monthly stipend of Rs.12,200/- (consolidated) during the remaining period of training. On satisfactory completion of training, candidates will be considered for appointment on probation to a regular post, subject to availability of vacancies in any Operation/Maintenance/ Service/ Mines area, with a minimum basic pay of Rs.9160/- in the pay scale of Rs.9160-3%-13150/- (S-3) with usual D.A. and allowances as admissible under the rules in force from time to time. Pay scale is due for upward revision w.e.f. 1.1.2012
Selection Process : Written test on General Aptitude (including knowledge in English and Telugu) and Branch (Mechanical/ Electrical/ Instrumentation). Test paper will be set in bilingual in English and Telugu. Candidates shortlisted based on performance in written test will be called for interview. Merit list will be prepared separately for each branch and candidates will be selected as per the vacancies in each branch
Fee : Examination & Processing fee of Rs.300/- (Rupees Three Hundred only) for General and OBC candidates. Application fees must be deposited in “RINL Recruitment Account No. 30589461220” at any of the core banking branches of State Bank of India in the prescribed Challan. No other form of payment is accepted
How to apply
Candidates should apply Online latest by 07th July 2014 at 5:30 PM
Click Here for Job Details
Apply Online
Company Profile : Visakhapatnam Steel Plant, popularly known as Vizag Steel (Telugu: విశాఖ ఉక్కు కర్మాగారం), is the most advanced steel producer in India with the help of German and soviet technology.Its products have been rated the best in the world market.Almost 80% of its income comes from the exports of steel products to Japan,Germany,United States,Singapore,Dubai,Australia,South American countries and many more.The company has grown from a loss making industry to 3 billion dollar turnover company registering a growth of 203.6% in just 4 years. Vizag Steel Plant has been conferred Navratna status on 17 November 2010. Founded in 1971, the company focuses on producing value-added steel, with 214,000 tonnes produced in August 2010, out of 252,000 tonnes total of salable steel produced. It is the largest single site plant in India and Asia minor(or south and east Asia combined).
History
Pylon at Vizag Steel Plant
On 17 April 1970, the then Prime Minister of India, the late Indira Gandhi announced the government's decision in the Parliament to establish a steel plant at Visakhapatnam. Planning started by appointing site selection committee in June 1970 and subsequently the committee‘s report was approved. On 20 January 1971 Mrs. Gandhi laid the foundation stone of the plant. Consultants were appointed in February 1971, and feasibility reports were submitted in 1972. The first block of land was taken over on 7 April 1974. M/s M.N. Dastur & Co was appointed as the consultants for preparing the detailed project report in April 1975 and in October 1977 they submitted a proposal for 3.4 Mtpa of liquid steel. With the offer for assistance from the government of the erstwhile USSR, a revised project evolved. A detailed project report for a plant with a capacity of 3.4 Mtpa was prepared by M/s M.N. Dastur & Co in November 1980. In February 1981 a contract was signed with the USSR for the preparation of working drawings of coke ovens, blast furnace and sinter plant. The blast furnace foundation was laid, with first mass concreting, in January 1982. The construction of the local township was also started at the same time.
In 1970's Kurupam Zamindars donated 6,000 acres of land for Vizag Steel Plant. A new company Rashtriya Ispat Nigam Limited (RINL) was formed on 18 February 1982. Visakhapatnam Steel Plant was separated from SAIL and RINL was made the corporate entity of Visakhapatnam Steel Plant in April 1982.
Vizag Steel Plant is the only Indian shore-based steel plant and is situated on 33,000 acres (13,000 ha), and is poised to expand to produce up to 20 MT in a single campus. Turnover in 2011-2012 was Rs 14,457 Crores. On 20 May 2009 Honorable Prime Minister Manmohan Singh launched the expansion project of Visakhapatnam Steel Plant from a capacity of 3.6MT to 6.3MT at a cost of Rs. 8,692 Crores. But the investment was revised to 14,489 crores with the following classification:
- Expenditure for the financial year 2009-10 Rs 1840 Crores.
- Rs 5883 Crores since inception of the Project.
- Total Commitment, including enabling works, steel procurement, Consultancy, Spares, etc. is Rs 11591 Crores as on 25.03.10.
Infrastructure
- Raw Material Handling Plant ( RMHP)
- Coke Ovens and Coal Chemical Plant
- Sinter Plant
- Blast Furnace
- Steel Melt Shop and Continuous Casting
- Light and Medium Merchant Mill
- Medium Merchant and Structural Mill
- Wire Rod Mill
- Steel Melt Shop
- THERMAL POWER PLANT
- Functions of CO&CCP
- COAL PREPARATION
- BATTERY
- COKE DRY COOLING PLANT
- COKE SORTING PLANT
- COKE CHEMICAL PLANT (CCP)
- GAS CONDENSATION SECTION
- AMMONIUM SULPHATE SECTION
- FINAL GAS COOLING&NAPTHELENE WASHING
- BENZOL RECOVERY
- DRY PURIFICATION UNIT
- GAS BLEEDER
- TAR DISTILLATION PLANT
BATTERY: The Prepared coal charge in the coal tower is drawn by a charging car on the top of the batteries and charged into the ovens as per sequence. The charged coal is gradually heated by the heating wall of the oven in the absence of air to attain a temperature of 1000°-1050°C at the central axis of the coke mass toward the end of coking period. the coking period is generally specified between 16 hrs and 19 hrs depending on oven condition and production requirement. the volatile matter of coal liberated during carbonization is collected in gas collecting mains in the form of raw coke oven gas passing through stand pipes and direct contact cooling with ammonia liquor spray. The gas cooled from 800°C is draw to coal chemical plant by exhauster. The residual coke is pushed out of the oven by pusher car through a guide into coke bucket. The red hot coke is taken to coke dry cooling plant for cooling.There are 3 batteries, each having 67 ovens each. Each oven can hold 32 tons of dry coal charge. The volumetric capacity of each oven is 41.6 cum the heat for carbonization is supplied by under firing of coke oven gas having CV of 4200 Kcal/Nm3 of mixture of BF gas & CO gas having 900 Kcal/Nm3. The heating system of batteries is of under jet, compound type having twin-heating flues with re-circulation of waste gases.